Princeton is modernizing the Firestone Library’s substation after half a century of continuous operation. The switchgear overhaul is designed to ensure reliable power supply for the next 30-40 years, while enabling a seamless transition between power feeds during planned maintenance activities.

Burns serves as the engineer of record, providing design and construction management services, including:

  • Electrical design of a 5kV primary select unit substation serving multiple campus buildings
  • Staging the switchgear replacement to ensure continuous operation of 24/7 campus facilities
  • Analysis of the existing 12bet Live Casinopower distribution system to optimize temporary power during project phasing
  • Mechanical designs to prevent overheating of switchgear within the Firestone Library substation as well as within supplemental switchgear rooms
  • Structural design of a newly installed, belowground access hatch to enable staged switchgear replacement — for the current project and any future upgrades
  • Specifications for Princeton to pre-purchase equipment, expediting project delivery by an estimated 4-6 months

Princeton anticipates to complete the Firestone Library switchgear replacements in 2024.

Previous projects include design of a resilient back-up power system for Princeton’s Environmental Studies and School of Engineering and Applied Sciences (ES+SEAS) complex.