12bet online casino
12bet Best Online Sports Betting Site
Contact Us
12bet online live casino games Contact Us 12bet app download

"*" indicates required fields

12bet Best Online Sports Betting Site

12bet Live Casino

12bet app downloadSt. John’s University is committed to a 50 percent reduction in campuswide carbon emissions by 2030, aligning with the NYC Carbon Challenge. To support campus decarbonization efforts — and make progress toward complying with New York City’s Local Law 97 (LL97) — the university is undertaking multiple projects to reduce reliance on carbon-intensive steam heating.

Acting as the engineer of record, Burns led mechanical/electrical/plumbing (MEP) design for the following electrification retrofits:

  • 12bet online casino: Replaced steam shell-and-tube heat exchanger with packaged air-source heat pump system for domestic hot water production
  • Montgoris Dining Hall: Replaced three steam absorption chillers with electric heater chillers to allow for chilled and heating hot water production. Piping infrastructure and controls enable future connection with a centralized ground-source heat pump district loop
  • School of Law: Replaced two steam absorption chillers with electric heater chillers. Upgraded steam shell-and-tube heat exchanger with a packaged air-source heat pump system for domestic hot water production
  • Louise de Marillac Hall: Replaced packaged terminal air conditioners (PTAC), including steam heating coils, with variable refrigerant flow heat pump units

The electrification projects reduce steam consumption, lowering campus fueling costs by decreasing demand on the central boiler plant. Calculated carbon emission reductions qualified the university for nearly $1.8 million in rebates 12bet online casinofrom New York State Energy and Research Development Authority (NYSERDA).

Projections of overall carbon reductions will avoid an estimated $300,000 in potential LL97 non-compliance fines. LL97 imposes legally binding emission limits on most New York City buildings larger than 25,000 square feet.

St. John’s is completing the retrofit projects in phases. Construction is scheduled to complete by winter 2023.

Photo credit: “St John’s University” by H.L.I.T., licensed under CC BY 2.0.

Location

New York, NY

Client

12bet app downloadSt. John’s University

Learn more about Burns' higher education solutions

12bet Live CasinoHigher Education

Project Lead

Dimitri Dumerlin, LEED AP

Healthcare/Facilities & Infrastructure Project Manager